Cloud migration that lands on day-1 productivity.

- 80+Cloud migrations
- Azure/AWS/GCPMulti-cloud
- Day-1Productivity
- 24/7Coverage
Six workstreams from on-prem to cloud-native.
Cloud assessment
Workload inventory, dependency mapping, target-platform fit assessment, cost modelling. Output: written migration roadmap with prioritised waves.
Architecture design
Landing zone design, identity federation, networking, security baselines, monitoring, backup. Cloud-adoption-framework aligned for Azure, AWS, or GCP.
Migration execution
Lift-and-shift, refactor, or replatform per workload. Database migrations, file-share migrations, application replatforming. Cutover rehearsed before the real one.
Optimization
Right-sizing, reserved-instance/savings-plan strategy, idle-resource cleanup, auto-scaling configuration. Most clients see 25-40% cost reduction post-optimization.
Security baselines
CIS benchmarks, secure landing zones, identity-first architecture, audit logging. Compliance-aware for ISO 27001, NESA, DFSA, ADGM clients.
Operations handover
Runbooks, monitoring dashboards, alerting integration, on-call escalation. Same team that migrated runs the cloud post-migration if you want continuity.
Cloud platforms we deploy and operate.
Four reasons clients pick us for the migration.
80+ migrations
Pattern recognition matters. We have moved workloads from on-prem to Azure, AWS, GCP across financial services, healthcare, retail, education.
Cost-discipline first
Cost modelling before migration, right-sizing during migration, optimization after migration. Most clients save 25-40% vs naive lift-and-shift.
Multi-cloud
Azure-native, AWS-native, GCP, plus hybrid configurations. We pick the platform that fits your workloads, not the one we resell.
Dubai-based engineers
Senior cloud engineers based in Dubai with Azure Solutions Architect, AWS Professional, and GCP Professional certifications.
The 6 R's of cloud migration.
Rehost (Lift and Shift)
Move applications as-is to the cloud with minimal changes. Best when speed matters more than cloud-native gains, or when the licence forces it. Fastest path to leaving the on-prem datacentre.
- Best for: time-sensitive migrations, quick wins
- Effort: low
- Benefit: fastest cutover, minimal risk
- Common workloads: Windows file servers, line-of-business apps
Replatform
Make minimal cloud optimisations without changing core architecture. Move database to managed RDS, swap NFS for managed file storage, containerise without redesign. Some cloud benefits without rewrite.
- Best for: balancing speed and optimisation
- Effort: medium
- Benefit: managed-service benefits, lower ops burden
- Common workloads: SQL Server to Azure SQL MI, MySQL to RDS
Refactor / Re-architect
Redesign applications to be cloud-native. Microservices, serverless functions, managed databases, container orchestration. Maximum cloud benefits, more time and risk in the move.
- Best for: long-term strategic value
- Effort: high
- Benefit: full cloud benefits, future-proof architecture
- Common workloads: legacy monoliths to microservices, container platforms
Repurchase (Replace)
Replace the application with a SaaS alternative. Common for CRM (Salesforce, Dynamics), HR (BambooHR, Workday), accounting (QuickBooks Online, Xero), email (M365, Workspace).
- Best for: standard business applications
- Effort: low (data migration only)
- Benefit: reduced maintenance, latest features
- Common workloads: legacy CRM, ERP, HRMS, email
Retire
Decommission applications that are no longer needed. Cloud assessment often reveals 10-20% of workloads are unused or duplicated. Retiring before migrating reduces scope and cost immediately.
- Best for: shadow-IT, unused or duplicated apps
- Effort: very low
- Benefit: reduced licence cost, smaller migration scope
- Common workloads: legacy reporting tools, old test environments
Retain
Keep certain workloads on-prem. Common for OT systems, regulator-bound data, hardware-tied licences, very recent capex. Hybrid architecture with cloud-on-prem connectivity preserves existing investment.
- Best for: OT systems, regulatory data, recent capex
- Effort: low (connectivity only)
- Benefit: preserves investment, regulator alignment
- Common workloads: SCADA, mainframes, on-prem-licensed apps
Migration profiles by sector.
Financial services
DIFC and ADGM-licensed firms migrating to Azure with regulatory data-residency, ADGM compliance, audit-ready infrastructure-as-code.
Healthcare
Hospitals and medical groups migrating clinical and admin workloads. PHI-aware architecture, DHA-compliant residency, regulator-coordinated cutover.
Professional services
Law firms and consultancies migrating document management, billing systems, matter-based workspaces. Confidentiality-aware architecture.
Tech and SaaS
SaaS companies migrating production workloads, building Azure landing zones, refactoring to cloud-native architectures.
Retail and e-commerce
Retail groups migrating ERP, e-commerce platforms, POS backends. Auto-scaling for peak retail traffic, multi-region failover.
Manufacturing and logistics
Manufacturing operations migrating ERP, WMS, OT-IT integration platforms. Hybrid architectures preserving on-prem OT continuity.
Education
Schools and universities migrating LMS, student-information systems, research platforms. KHDA-aligned residency, parent-portal continuity, exam-system uptime.
Government
Federal and Emirate-level entities migrating to Azure with sovereign-cloud residency, NESA T-control alignment, classified-data segregation, and inter-agency integration.
Five phases from on-prem to optimised cloud.
- 01Phase 1· 1-2 weeks
Discovery and Assessment
Comprehensive analysis of your current infrastructure and cloud readiness. Output: workload inventory, dependency map, cost model, migration roadmap.
- Infrastructure inventory across servers, network, storage
- Application dependency mapping
- Performance baseline analysis
- Cost-benefit analysis with TCO model
- Risk assessment and cloud-readiness scoring
- 02Phase 2· 2-3 weeks
Migration Strategy and Planning
Detailed migration roadmap with chosen strategy per workload (the 6 Rs). Architecture design, timeline, resource allocation, and success criteria.
- Migration approach per workload (rehost / replatform / refactor / etc.)
- Target architecture design with landing zone
- Timeline with sequenced waves
- Resource allocation and team plan
- Success criteria per workload
- 03Phase 3· 2-4 weeks
Pilot Migration
Test the migration process with non-critical workloads. Validate the runbook, refine the approach, build team confidence before production cutover.
- Pilot workload migration (1-3 apps)
- Performance and security validation
- User acceptance testing
- Runbook refinement based on lessons learned
- Go / no-go decision for full migration
- 04Phase 4· 4-16 weeks
Full Migration Execution
Systematic migration of all workloads in waves. Each wave rehearsed, validated, and signed off before the next begins. Rollback capability at every step.
- Wave-based workload migration
- Database, application, and data migration
- Continuous validation and rollback ready
- Documentation updated as workloads land
- Cutover communications to end users
- 05Phase 5· Ongoing
Optimisation and Support
Continuous monitoring and optimisation of the cloud environment. Right-sizing, reserved-instance strategy, idle cleanup; 25-40% cost reduction target post-migration.
- Performance monitoring and tuning
- Cost optimisation (target 25-40% reduction)
- Security hardening and CIS benchmarks
- Auto-scaling recommendations
- Quarterly health checks and improvement reviews
Why managed cloud migration beats DIY.
| Feature | DIY migration Existing IT team | Managed migration GR IT cloud team |
|---|---|---|
Time to first production workload | 6-12 months | 6-12 weeks |
Cost-modelling accuracy | Often 30-50% off | Within 10% |
Cutover rehearsal | Often skipped | Standard practice |
Post-migration optimization | Limited | 25-40% cost reduction typical |
Compliance-aware design | Variable | Framework-aligned |
Day-1 incident response | Best-effort | 5-min P1 SLA |
Total cost (3-year mid-market) | Higher (delays + over-provisioning) | Lower (optimization + speed) |
What clients see post-migration and post-optimisation.
Average infrastructure savings after right-sizing and reserved-instance strategy.
High availability with redundancy, failover, and managed-service SLAs.
Accelerated application deployment via IaC and CI/CD pipelines.
Improved application latency and throughput on cloud-native infrastructure.
Replication-based migration and rehearsed cutover windows.
Round-the-clock support from Dubai-based certified cloud engineers.
From assessment to managed cloud operations.
- 1
Assessment
2-4 weeks
Workload inventory, dependency mapping, cost modelling, target-platform fit. Output: migration roadmap and SOW.
- 2
Design
3-6 weeks
Landing zone, networking, identity, security, backup architecture. Reviewed and signed off before any workload migration.
- 3
Migrate
4-16 weeks
Workloads migrated in waves, cutover rehearsed before each wave, validation gates before next wave. Most workloads complete with no production impact.
- 4
Optimize and operate
Continuous
Right-sizing, reserved-instance optimization, idle cleanup, ongoing monitoring. Steady-state cloud operations from week 1 post-migration.
“We had 23 on-prem servers running our trading floor and back office. GR IT spent four weeks on assessment, six weeks on design, and twelve weeks migrating to Azure with zero trading-day disruption. Two months post-migration, our cloud spend dropped 32% from the initial estimate after right-sizing and reserved instances. The cost discipline was as valuable as the migration itself.”
Eight industries with active production workloads on cloud.
Financial services
DIFC and ADGM-licensed firms with Azure regulatory residency.
Healthcare
Clinical and admin workloads with PHI-aware architecture and DHA residency.
Retail and e-commerce
ERP, e-commerce, POS backends with auto-scaling for peak retail traffic.
Manufacturing and logistics
ERP, WMS, OT-IT integration with hybrid OT continuity.
Education
LMS, SIS, research platforms with KHDA-aligned residency.
Government
Sovereign-cloud residency with NESA T-control alignment.
Professional services
Document management, billing, matter-based workspaces with confidentiality-aware architecture.
Tech and SaaS
Production workloads, Azure landing zones, cloud-native refactors.
Cloud Migration Services, frequently asked.
Resources for cloud-migration leads.
Microsoft 365
M365 cloud services often migrate alongside infrastructure. Tenant administration, identity, security baseline as part of broader cloud strategy.
Disaster recovery
Cloud-native DR programmes. Often deployed during migration: written RPO/RTO targets, replication architecture, annual live rehearsal.
Server management
Post-migration server operations. Patch management, monitoring, backup, performance tuning across cloud workloads.
Talk to a cloud-migration specialist.
Three-minute form. Our cloud team gets back the same business day to schedule a discovery call. We will tell you whether your workloads are cloud-ready and what the realistic timeline looks like.
Related Services
Explore more solutions that work great with this service
Data Centre Colocation
Tier III racks, migration, remote hands, UAE residency
Managed IT Services
Complete outsourced IT department
Disaster Recovery & BC
Business continuity and disaster recovery planning
Server Management
Windows and Linux server administration
Microsoft 365
Complete Microsoft 365 setup, migration & support